TITLE: 01/02 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 158Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: H1 remained locked throughout the shift, and the only drop from observing was intentionally for commissioning. H1 has now been locked for almost 21 hours.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
22:08 | OPS | LVEA | LVEA | N | LASER SAFE | Ongoing |
17:25 | FAC | Kim | MX | N | Technical cleaning | 18:05 |
18:38 | FAC | Kim | H2 Bldg | N | Technical cleaning | 18:49 |
18:49 | FAC | Kim | MY | N | Technical cleaning | 19:40 |