TITLE: 01/07 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently Observing and have been locked for over 14 hours. Chill shift today with some commissioning in the middle but mostly Observing.
LOG:
16:32 Out of Observing for Commissioning
19:30 Observing
20:29 Potential for noise in darm due to scheduled nearby explosion tagging detchar (probably up to a few hours after) tagging detchar
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:52 | Cement truck | Staging building | n | pouring cement | 17:22 | |
15:00 | FAC | Kim | OpticsLab | n | Tech clean | 15:58 |
16:47 | SQZ | Sheila, Camilla | LVEA | y(local) | Adjusting OPO crystal position | 18:32 |
18:57 | PCAL | Tony | PCAL Lab | y(local) | PCALin' | 19:04 |
21:13 | ISC | Camilla | Optics Lab | n | Pulling out tools | 21:50 |