Reports until 13:47, Tuesday 28 January 2025
H1 PEM
ryan.crouch@LIGO.ORG - posted 13:47, Tuesday 28 January 2025 (82152)
Dust Monitor Quarterly Testing

Closes FAMIS27660

For the CS dust monitors.

Clean & Bake: Passed both flow rate and zero count on the first try.

Staging BBSS lab: Passed both flow rate and zero count on the first try.

DR (diode room): Passed both flow rate and zero count on the first try.

LVEA: 

5: Passed flow and zero count on the first try but it's left off as it's a pumped DM.

6: Passed both flow rate and zero count on the first try.

10: Passed both flow rate and zero count on the first try.

FCES: Passed both flow rate and zero count on the first try.

For the Labs.

LAB1 (Optics): Passed zero count on the first try but the flow was a little low, I increased it.

LAB2 (PCAL/Vac Prep):  Passed both flow rate and zero count on the second try (1 ct of 0.03).

PSL: 101 (Anteroom), 102 (Laser room). I did not check these, RyanS will check them the next time he does a PSL excursion.

For the ends.

EndY: Passed both flow rate and zero count on the first try.

EndX:  Passed the zero count on the first try but I had to increase the flow rate.