Closes FAMIS27660
For the CS dust monitors.
Clean & Bake: Passed both flow rate and zero count on the first try.
Staging BBSS lab: Passed both flow rate and zero count on the first try.
DR (diode room): Passed both flow rate and zero count on the first try.
LVEA:
5: Passed flow and zero count on the first try but it's left off as it's a pumped DM.
6: Passed both flow rate and zero count on the first try.
10: Passed both flow rate and zero count on the first try.
FCES: Passed both flow rate and zero count on the first try.
For the Labs.
LAB1 (Optics): Passed zero count on the first try but the flow was a little low, I increased it.
LAB2 (PCAL/Vac Prep): Passed both flow rate and zero count on the second try (1 ct of 0.03).
PSL: 101 (Anteroom), 102 (Laser room). I did not check these, RyanS will check them the next time he does a PSL excursion.
For the ends.
EndY: Passed both flow rate and zero count on the first try.
EndX: Passed the zero count on the first try but I had to increase the flow rate.