SRM ready for Phase 2b testing

This morning, Travis finished swapping the incorrect blade tip EQ stops on the SRM top mass with the correct ones and then reset the BOSEMs to 50% OLV.  This supsension is ready for Phase 2b testing.  Note, we skipped Phase 2a testing since the "optic" used for this round of the SRM installation is a dummy 2" optic in a metal dummy mass.