This morning, Travis finished swapping the incorrect blade tip EQ stops on the SRM top mass with the correct ones and then reset the BOSEMs to 50% OLV. This supsension is ready for Phase 2b testing. Note, we skipped Phase 2a testing since the "optic" used for this round of the SRM installation is a dummy 2" optic in a metal dummy mass.