Diag Main has now got a PSL_Chiller message telling me to Check the PSL Chiller.
I ran the PSL Status script to hopefully get some insight.
Laser Status:
NPRO output power is 1.842W
AMP1 output power is 70.15W
AMP2 output power is 137.0W
NPRO watchdog is GREEN
AMP1 watchdog is GREEN
AMP2 watchdog is GREEN
PDWD watchdog is GREEN
PMC:
It has been locked 28 days, 23 hr 15 minutes
Reflected power = 25.55W
Transmitted power = 102.4W
PowerSum = 127.9W
FSS:
It has been locked for 0 days 3 hr and 32 min
TPD[V] = 0.781V
ISS:
The diffracted power is around 4.2%
Last saturation event was 0 days 3 hours and 32 minutes ago
Possible Issues:
PMC reflected power is high
Check chiller (probably low water)
PSL probably wants some water and someone to chill with.
The plots below seem like it might be a little lonely.
I just got the verbal alarms alert to Check the PSL Chiller.
I topped off the PSL chiller with ~100mL of water.