H1 General
anthony.sanchez@LIGO.ORG - posted 16:46, Wednesday 15 January 2025 (82301)
Wednesday Day Shift end

TITLE: 01/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 158Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
Great Day of Observing!
Dropped down to Commissioning twice:
Once due to an earthquake causing the SQZr to  lock loss- but we stayed in NLN.
And another time due to an Xtreme PI Damping event. Once again we stayed in NLN.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:45 PSL Ryan C PSL Chiller N Checking the PSL Chiller water level 18:15
17:46 FAC Kim Optics Lab Yes Tecnical cleaning 16:46
17:56 PEM Ryan C VAC Prep n Tracing Dust mon issues and wires 18:16
19:05 PCAL Francisco & Kim PCAL Yes Technical Cleaning 19:34
21:13 R&R JC Overpass N Walking over to the Overpass 21:23
22:46 VAC Janos EX n Work in maintenance room 23:09
00:28 PCAL Francisco PCAL Lab Yes PCAL measurements 01:08

 