TITLE: 01/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ryan S
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.23 μm/s
QUICK SUMMARY:
Comissioning Activities:
Calibration sweep: completed
OMC ASC Alignment test : Completed
PR2 Beam spot measurement : Ongoing.
PEM CPS Slider Ghost beam investigations: ongoing
SRC Injection sweeps: Complete
Squeeze measurements: Ongoing.
Lockloss from NLN_CAL_MEAS @ 18:56 UTC
Alarm Handler:
Dust PSL 101 again.