Reports until 15:52, Wednesday 23 October 2013
LHO General
cheryl.vorvick@LIGO.ORG - posted 15:52, Wednesday 23 October 2013 (8236)
Ops

 

Morning Meeting Notes - from Corey

Work Permits

 

ETMx

HEPI:  Actuators attached (but galled bolt yesterday slowed things), see a little bit of a tilt

--look at level (Doug or Hugh)

Have Thomas do ACB checks, and then do ETMx alignment

After alignment, unlock ISI & run TFs

 

ITMx

Payload last night & need to check lockers

Dropping cables down

 

AOS (Cryopump Baffle)

parts staged

ready to assemble this morning(Mitch/Gerardo/Thomas)

 

Apollo

BSC3 feed-thrus

 

Notes from the rest of the day: Cheryl

 

Facilities:

X arm insulation removal

Rollup doors - EY and MY

Roofing continues

 

LVEA general work:

ACB assembly continues

 

Control Room:

ITMX model restart

DAC restart

EX restart

 

Many more restarts - testing code - Rolf and Dave/CDS

- code tested today will be backed out tonight starting around 4PM

- Dave's estimate is that it will take an hour to load and restart code

 

EX:

 - Thomas is back, no others there to my knowledge