TITLE: 01/22 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Maintenance day today, recovery was straight forward in terms of alignment, but we had a lock loss after DRMI ASC and then one at Transition_From_ETMX, which made recovery take a bit longer.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
17:16 | SAFETY | LAZER HAZ (\u2310\u25a0-\u25a0) | LVEA | !!!YES!!! | LVEA = LASER HAZARD! | 16:51 |
16:07 | FAC | Chris | LVEA | yes | FAMIS tasks | 16:38 |
16:10 | PCAL | Francisco | EX | YES | PCAL spot move | 17:33 |
16:27 | SUS | RyanC | CR | N | ETMY oplev charge measurement | 17:36 |
16:32 | FAC | Kim, Nelly | LVEA | yes | Tech clean | 17:33 |
16:48 | SYS | Mitchell | LVEA | yes | Looking for cables | 17:21 |
16:59 | FAC | Chris | LVEA | yes | Battery fluid | 17:46 |
17:02 | PEM | Robert | LVEA | yes | Setting up equipment | 19:42 |
17:06 | PSL | Jason, Ryan S | CS | n | Chiller swap (PSL DOWN!) | 19:37 |
17:22 | VAC | Janos, Travis | LVEA | yes | Chat with Chris | 17:32 |
17:25 | CDS | Fil, Marc | CER | n | Investigating for future OMC work | 17:42 |
17:33 | FAC | Kim, Nelly | EX | n | Tech clean | 18:35 |
17:37 | FAC | HFD | Ends | n | Radio testing | 18:52 |
17:47 | FAC | Chris | H2 | n | Tumbleweed clearing | 19:41 |
18:04 | VAC | Janos, Travis | EX mech room | n | Compressor work | 20:02 |
18:27 | CDS | Fil, Marc, Sivananda | CER | n | Power supply fan swap | 19:54 |
18:28 | PSL | Jason | PSL ante. room | yes | Looking for ISS array parts | 18:47 |
18:36 | FAC | Kim, Nelly | FCES | n | Tech clean | 19:00 |
18:51 | SYS | Mitchell | LVEA | yes | Cable hunt Rd2 | 19:04 |
19:00 | SUS | RyanC | CR | N | ETMX oplev charge meas | 20:08 |
19:06 | SEI | Jim | CR | n | BSC filter testing | 20:02 |
19:10 | FAC | Kim | EY | n | Tech clean | 19:47 |
19:19 | TCS | Camilla, Matt | LVEA | YES | TCS table power meas. | 20:12 |
19:55 | SYS | Chris, Mitchell | LVEA | yes | Scissor lift troubleshooting | 20:01 |
19:58 | ALS | Keita, Mayank | CR | n | ALSY demod phase measurement | 20:58 |
20:00 | - | Mike, Haydee | LVEA | yes | Tour | 20:19 |
20:22 | IAS | Ryan C | LVEA | yes | Faro power cycle | 20:24 |
20:24 | - | Ryan S, Matt | LVEA | yes | LVEA sweep | 20:55 |
22:28 | PEM | Robert | LVEA | Yes | Setup stray beam at viewport equipment | 23:49 |