thomas.shaffer@LIGO.ORG - posted 13:04, Thursday 23 January 2025 (82411)
Ops Day Shift End

TITLE: 01/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Tony
SHIFT SUMMARY: We are currently finishing up few minor commissioning items and a calibration measurement and then we will be headed into observing. Two lock losses during my shift, one from the calibrators and one most likely from some view port work. Relocks were straight forward.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:16 SAFETY LAZER HAZ  (\u2310\u25a0-\u25a0) LVEA !!!YES!!! LVEA = LASER HAZARD! 16:35
16:35 FAC Kim Opt Lab n Tech clean 16:57
17:55 FAC Kim MY n Tech clean 18:59
18:12 PEM Robert LVEA YES Setup viewport power metering 18:47
18:15 VAC Richard, Ken EX n Look at compressor electrical 18:47
18:49 ISS Keita, Rahul, Mayank, Sivananda, Jennie Opt Lab n ISS array prep 20:36
19:41 PEM Robert LVEA yes VP pictures near BSC3 20:31