Jeff K. recompiling h1susitmy, restarting h1susb123, restarting DAQ Oscillation on TMSX OSEMs observed, see Keita's alog Robert S. running magnetic injections on ITMY 09:15 Mitchel R. going into the LVEA to work on the cyropump baffle assembly between the X arm and H2 PSL enclosure 09:21 Gerardo M. joining Mitchel R. to work on the cyropump baffle assembly 09:30 Jim W. and Greg G. dropping down ISI cabling at ITMX 09:36 Jeff K. restarting h1ascimc 09:51 Richard M. and Peter K. going into the LVEA to look at HAM1, HAM2 Betsy W. running transfer functions on ETMX 10:08 Corey G. looking for alpha wipes in the LVEA 10:46 Driver for Praxair delivery to CP1 called notifying he was 15 minutes away 13:07 Mitchel R. heading back to the LVEA to work on the cyropump baffle assembly 13:20 Gerardo M. heading back to the LVEA to work on the cyropump baffle assembly 13:28 Ken working on conduit at end X, was at end Y 13:47 Hugh R. and Jim W. floating BSC3 on HEPI ~14:21 Lost and regained the midX FMCS channels, except for the pump status. Error reported on the FMCS server as well. 14:44 Stefan B. restarting h1odcmaster, h1odcy and h1odcx models 15:47 Hugh R. and Jim W. done at BSC3, Mitchel R. done at cyropump baffle assembly 16:01 DAQ restart