Reports until 18:43, Thursday 24 October 2013
LHO General
patrick.thomas@LIGO.ORG - posted 18:43, Thursday 24 October 2013 (8246)
Ops Summary
Jeff K. recompiling h1susitmy, restarting h1susb123, restarting DAQ
Oscillation on TMSX OSEMs observed, see Keita's alog
Robert S. running magnetic injections on ITMY
09:15 Mitchel R. going into the LVEA to work on the cyropump baffle assembly between the X arm and H2 PSL enclosure
09:21 Gerardo M. joining Mitchel R. to work on the cyropump baffle assembly
09:30 Jim W. and Greg G. dropping down ISI cabling at ITMX
09:36 Jeff K. restarting h1ascimc
09:51 Richard M. and Peter K. going into the LVEA to look at HAM1, HAM2
Betsy W. running transfer functions on ETMX
10:08 Corey G. looking for alpha wipes in the LVEA
10:46 Driver for Praxair delivery to CP1 called notifying he was 15 minutes away
13:07 Mitchel R. heading back to the LVEA to work on the cyropump baffle assembly
13:20 Gerardo M. heading back to the LVEA to work on the cyropump baffle assembly
13:28 Ken working on conduit at end X, was at end Y
13:47 Hugh R. and Jim W. floating BSC3 on HEPI
~14:21 Lost and regained the midX FMCS channels, except for the pump status. Error reported on the FMCS server as well.
14:44 Stefan B. restarting h1odcmaster, h1odcy and h1odcx models
15:47 Hugh R. and Jim W. done at BSC3, Mitchel R. done at cyropump baffle assembly
16:01 DAQ restart