TITLE: 01/30 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Earthquake
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Currently relocking and at PREP_DC_READOUT_TRANSITION. Lockloss was due to a nearby earthquake, but luckily we didn't have to wait in DOWN for very long before we could start trying to relock.
LOG:
00:00 Relocking and at DHARD_WFS
00:27 NOMINAL_LOW_NOISE
00:30 Observing
04:55 Lockloss due to earthquake
05:05 Started trying to relock, ran an initial alignment