Reports until 17:09, Monday 03 February 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 17:09, Monday 03 February 2025 (82616)
OPS Day Shift Summary

TITLE: 02/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

IFO is in NLN and OBSERVING as of 19:06 UTC
Calm day overall with a lot of improvements to locking issues in the weekend from the 8:30 to 11:30 AM comissioning time.

Namely:

SQZ weekend issue fixes: alog 82604

Weekend Low Range Checks (coherence and A2L) changes: alog 82605

SDF Scripts accepted after comissioning: alog 82614 (and attached).

LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:16 SAFETY LASER SAFE  ( \u2022_\u2022) LVEA SAFE! LVEA  SAFE!!! 19:08
17:38 FAC Chris MY N HVAC Maintenance 18:38
18:47 PCAL Tony PCAL Lab Local PS4/5 Measurement 19:09
20:49 VAC CEBEX MY N CEBEX Walkthrough 21:32
21:50 ISC Jennie, Mayank, Shivananda Optics Lab Local Mode matching for ISS 22:50
23:17 ISC Matt, Camilla Optics Lab Local Tool pan sorting 00:17
00:29 PCAL Tony Francisco PCAL Lab Local PS5/4 Measurement 01:29
Images attached to this report