Displaying report 1-1 of 1.
Reports until 16:07, Thursday 13 February 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:07, Thursday 13 February 2025 (82790)
Ops Day Shift End

TITLE: 02/13 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Unlocked
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: LVEA temperature changes were a bit topic today, there have been some changes made to averaged sensors used and soem of their setpoints. EX is also rising a bit in the VEA atm.

The beginning of the shift was spent trying to get ALSX to lock. Eventually, Sheila and others went out onto ISCT1 and shimmed up the TRX DCPD to get more light on the PD without interferring with the PR3 alignment (alog82783). This is intended as a temporary solution. ALSX locked without issue after this and then there was a brief commissioning period. The SQZr briefly knocked us out of observing, but Camilla and I bumped the threshold a bit lower and it was able to relock (alog82789). We just lost lock from an earthquake from Alaska. Sad.
LOG:

Displaying report 1-1 of 1.