Reports until 07:47, Monday 17 February 2025
H1 SQZ (SQZ)
corey.gray@LIGO.ORG - posted 07:47, Monday 17 February 2025 - last comment - 07:58, Monday 17 February 2025(82849)
H1 Wake Up Call Due to SQZ OPO LR node (SHG TEC Set Temperature needed to be lowered)

1452utc (652ampdt):  Wake up call due to No Squeezing.

SQZ Symptoms & Solution:

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 07:58, Monday 17 February 2025 (82850)

It's been about 20min since we went back to Squeezing, but it appears the adjusting of the SHG TEC Setpoint Temperature made squeezing possible, but now the range did not improve at all.  Left a note for the Day Shift in mattermost.

Images attached to this comment