TITLE: 02/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: The shift started out with a lock loss just before commissioning time. We took this opportunity to move PR2 spot while out of lock to find the baffle edges. We then relocked and Sheila and Oli fixed and issue we had causing lock losses at transition from ETMX (alog82912). We went back to observing for a few hours before stepping out to tune the SQZ angle and run a quick PRCL OLG. Results on the latter will be posted by Ibrahim later after he takes another to compare.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:34 | SAF | Laser Haz | LVEA | YES | LVEA is laser HAZARD!!! | 06:13 |
19:12 | FAC | Les Schwab | Xarm | n | Truck tire repair | 21:07 |
20:39 | FAC | Eric | EX mech | n | Serial numbers | 20:45 |
21:24 | - | Betsy | Opt Lab | n | Parts and more parts | 21:52 |