Displaying report 1-1 of 1.
Reports until 16:18, Thursday 20 February 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:18, Thursday 20 February 2025 (82934)
Ops Day Shift End

TITLE: 02/21 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 156Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Lock loss at the start of the shift again, this one caused but  , followed by a commissioning period and a calibration measurement. ITMY modes 5&6 rang up slowly overnight and continue to be an issue to damp (82940). As of right now, I'm not sure we've found a setting that is actually damping these modes. We've been locked for 6.5 hours, observing for 2.5 of those.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:34 SAF Laser Haz LVEA YES LVEA is laser HAZARD!!! 06:13
17:55 FAC Tyler MY n Fire panel check 18:55
17:56 PEM Robert LVEA yes Turn on amps 19:22
18:15 ISC Sheila, Mayank, Matt LVEA yes ISCT table work with POP 18:43
18:28 FAC Kim MY, MX n Tech clean 19:31
Displaying report 1-1 of 1.