Reports until 13:34, Monday 24 February 2025
H1 CDS
david.barker@LIGO.ORG - posted 13:34, Monday 24 February 2025 (83018)
Added X6,Y6 vacuum gauges to VACSTAT

WP12342

Janos, Dave:

VACSTAT was extended by the addition of the X6 and Y6 beam tube ion-pump vacuum gauges. These are located about 100m from their respective end stations, and are solar powered.

The service was restarted at 11:20. The extended medm is shown attached.

Images attached to this report