Reports until 07:54, Tuesday 25 February 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:54, Tuesday 25 February 2025 (83029)
OPS Day Shift Start

TITLE: 02/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 33mph Gusts, 23mph 3min avg
    Primary useism: 0.11 μm/s
    Secondary useism: 0.78 μm/s
QUICK SUMMARY:

IFO was in PREP_FOR_LOCKING, unable to lock due to microseism and very high winds. IFO is now in PREVENTATIVE MAINTENANCE (and SEI_ENV in MAINTENANCE) for our planned 6 hour Tuesday Maintenance.

A short list of planned maintenance:

Work safe and be mindful of flying tumbleweeds.