TITLE: 02/25 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: USEISM
Wind: 33mph Gusts, 23mph 3min avg
Primary useism: 0.11 μm/s
Secondary useism: 0.78 μm/s
QUICK SUMMARY:
IFO was in PREP_FOR_LOCKING, unable to lock due to microseism and very high winds. IFO is now in PREVENTATIVE MAINTENANCE (and SEI_ENV in MAINTENANCE) for our planned 6 hour Tuesday Maintenance.
A short list of planned maintenance:
Work safe and be mindful of flying tumbleweeds.