TITLE: 02/28 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 143Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY:
Decent shift with only one lockloss (whose recovery was straightforward but an initial alignment was needed due to usual ALSy shenanigans). Also had a tour from a group from the VIT plant.
LOG:
- 1609 Contractor (MacDonald Miller) working near H2 Room and VPW for HVAC (tyler)
- 2119 Let them back in through the gate
- 1617 Optics Lab cleaning (kim)
- 1627 Incoming EQ from Russia on verbal; M5.2 and did not see any effects
- 1753 SEI_ENV returns to CALM (after being at USEISM for about the last 32hrs).
- 2026 VACSTAT alarm caught & cleared by dave
- 2029 Lockloss
- 2039-2058 Initial Alignment
- 2151 OBSERVING
- 2113 ISS Array cable inventory work (keita)
- 2136-2143 Mock Feedthru to ISS team (rahul)
- 2213 Siva joining
- 2223 Matt, Myank, Kieta heading back in the optics lab.