Reports until 22:05, Saturday 01 March 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 22:05, Saturday 01 March 2025 (83125)
Saturday Eve Shift summary

TITLE: 03/02 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 11mph Gusts, 8mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.59 μm/s
QUICK SUMMARY:

Locking has been very difficult this evening. Getting past ALS and DRMI has been challenging. Possibly due to the Microseism.
I was able to get ISC_LOCK up to Low_Noise_ETMX before a lockloss.

H1 current status:
I have taken ISC_LOCK to Initial_Alignment again to see if H1 will get past DRMI and actually get locked.
It does seem like the microseism is falling so hopefully we can get locked on the OWL shift via H1 Manager.