Reports until 07:42, Sunday 02 March 2025
LHO General
corey.gray@LIGO.ORG - posted 07:42, Sunday 02 March 2025 (83126)
Sun DAY Ops Transition

TITLE: 03/02 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 0mph Gusts, 0mph 3min avg
    Primary useism: 0.04 μm/s   (yesterday 0.11 μm/s)
    Secondary useism: 0.47 μm/s (yesterday 0.81 μm/s)
QUICK SUMMARY:

H1's had a great night with a current 8+hr lock.  Secondary microseism AND Primary microseism have both been trending down over the last 18-24hrs (see attached). 

LVEA Wifi continues to come up as "ON" in Verbal (but it's been in the INVALID state since 1008amPST on Maintenance Day, see attached).

Images attached to this report