Reports until 16:30, Tuesday 04 March 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Tuesday 04 March 2025 (83169)
OPS Tuesday day shift summary

TITLE: 03/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: DRMI/PRMI has been giving us issues in the maintenance recovery, PRMI_ASC doesn't seem to actually improve the signal or camera. The wind has been increasing over the past 4 hours and the 2ndary microseism has been decreasing. We've run 1 full IA and a 2nd with only SRC. Some yellow PSL laser room alarms, probably from the wind.
LOG:                                                                                                                                                                      

Start Time System Name Location Lazer_Haz Task Time End
15:37 CDS Erik Office N SUS EX restart for RCG upgrade 16:17
15:56 EE Ken EndY N Mech room compressor work 21:40
16:04 FAC Tyler & Chris Optics lab N Move stuff 17:42
16:10 FAC Tyler Old bake lab N Removing old elevator, NOISY AND DIRTY 17:42
16:11 LSC Daniel LVEA N REFL measurements 18:41
16:11 FAC Kim & Nellie EndY N Tech clean 17:11
16:12 CDS Jonathan Office N Digivideo work 16:39
16:17 CDS Erik CER N Working on broken WAPs (LVEA) 19:45
16:22 EE Fil LVEA N LY vac rack ups 16:38
16:24 IAS Jason, RyanC LVEA N FARO surveying 20:15
16:26 VAC Jordan, Travis EY MER N Mech room, compressor 21:54
16:39 SEI Fil CER N SEI rack electronics 19:17
16:50 AOS Richard LVEA N Checks 17:07
16:53 FAC Mitchell,  Jim, Betsy LVEA N Checks around HAM1 19:44
16:58 CAL Francisco EX YES PCal measurement 18:12
17:03 VAC Janos, Gerardo EX MER N Compressor testing 21:54
17:14 TCS TJ MER/LVEA N Chiller piping checks 18:03
17:24 FAC Chris (+Pest Control) LVEA, Arms, Ends YES (EX) FAMIS tasks, Pest control 18:30
18:06 FAC Tyler MX, MY N 3IFO checks 19:06
18:17 TCS TJ LVEA N Adjusting TCS lines 18:32
18:20 FAC Nellie LVEA N Technical cleaning 19:34
18:25 CAL Jeff CER/LVEA N Pictures at SUS racks 19:43
18:31 FAC Chris MER n Tumbleweed clearing 21:23
19:14 FAC Tyler All Bldgs N Measuring technical slabs 21:14
19:15 CDS Erik EY N Plugging in timing system 20:10
19:15 FAC Richard EY N Checking in w/ Ken 19:48
19:17 EE Fil LVEA N Table electronics documentation 20:13
19:53 AOS Betsy, Mitchell LVEA N HAM1 Checks 20:13
21:20 ALS TJ, Sheila LVEA, ISCT1 LOCAL Table adjustment 22:20
21:27 OPS RyanC LVEA N Sweep 21:50
21:39 ISC Siva, Mayank Opt Lab N ISS array Ongoing
21:53 VAC Gerardo Optics lab/ VAC prep N Find a viewport 21:59
22:02 ISC Keita Optics lab N Join ISS work Ongoing
23:22 VAC Janos EndX N Quick measurement 23:36

Some of the maintance items completed today includes: