Displaying report 1-1 of 1.
Reports until 16:30, Wednesday 05 March 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:30, Wednesday 05 March 2025 (83190)
OPS Wednesday DAY shift summary

TITLE: 03/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: We lost lock early in the day and struggled to get back up due to ASC issues, we've been locked for ~ 3 hours. Sheila turned off SRC1 & SRC2 in ISC_DRMI.py in ENGAGE_DRMI_ASC to help us lock.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:08 FAC Kim Optics lab & Vac prep N Tech clean 16:31
16:11 FAC Nellie H2 N Tech clean 16:32
17:04 ISC Sheila, TJ ISCT1 LOCAL Table checks/adjustments 17:20
17:16 FAC Tyler + contractors VAC prep lab N Heating checks 18:24
17:24 FAC Kim & Nellie MidX N Tech clean 18:24
18:08 FAC Jim, Mitchell Ends n Taking measurements on wind fence 19:29
18:30 FAC Nellie Firepump room N Tech clean 19:20
18:45 VAC Travis, Gerardo EndX MR N Piping, compressor work 19:53
21:41 EE Fil, Marc OSB Recieving N Bring parts from LSB to OSB recieving 21:55
21:55 CAL Tony PCAL lab LOCAL PCAL work 22:06
21:56 EE Fil, Marc MidY N Parts dropoff 22:16

 

Images attached to this report
Displaying report 1-1 of 1.