Displaying report 1-1 of 1.
Reports until 16:29, Sunday 09 March 2025
LHO General
corey.gray@LIGO.ORG - posted 16:29, Sunday 09 March 2025 (83248)
Sun DAY Ops Summary

TITLE: 03/09 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Aligning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:

Today (and last night) was ETMx-related with (2) ETMx locklosses (one overnight & one at very start of shift).  Then had almost 5hrs of downtime with 3 locklosses in a row at LOWNOISE_ESD_ETMX (resulting in making some Calls for help, but H1 came back on its own...after pausing for about an hr before this troublesome state---see alogs).  Keita also suggests some measurements we should run next time we are locking.  Secondary microseism has mostly been flat (but maybe if you squint at it right, you can see it possibly drifting down).  Winds have  been around 20mph for much of the last 6hrs.

H1 is finally thermalized, so a calibration could be run (but microseism is high still, so I'd be wary...esp with the grief of getting through LOWNOISE ESD ETMx this morning).
LOG:

Displaying report 1-1 of 1.