Reports until 15:20, Monday 10 March 2025
H1 SUS (CDS)
oli.patane@LIGO.ORG - posted 15:20, Monday 10 March 2025 (83273)
Preparation for PM1 con't: more model changes

Jeff, Jim, Oli
ECR E1700228

Previously, the h1isiham1 simulink model terminated the outputs coming out of the GS13. Now that we'll be installing the ISI, we will need those, so we've taken those outputs, converted them to Euler DOFs, and then have Length being sent out over to the HTTS(after-h1isiham1). In the h1sushtts model, we then updated the Length input coming over PCIe from h1isiham1 (currently called TTL4CFF_2_PM1 - eventually this and the TTL4C_2_RMs will be all changed over to be from ISIs). Last time (83196) we had set 0s to feed into the L, P, and Y components of TTL4C_2_PM1, but now L is reading in from h1isiham1 PM1 Length (after-h1sushtts). For now, we are still going to be reading from the TTL4CFFs for RM1 and RM2 (the same as they have been).

Both h1isiham1 and h1sushtts have successfully compiled and have been svn'd at revisions:

h1sushtts.mdl     30950
h1isiham1.mdl     30951

 

Images attached to this report