TITLE: 03/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Calibration and commissioning time this morning, but we have also been struggling a bit with relocking. We aren't entirely sure what particular problem is causing the lock losses on acquisition, but the elevated wind and useism aren't helping. We are now on DC readout though, so we're making progress.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:01 | PEM | Robert | LVEA | n | Setup shaker | 16:22 |
16:22 | IAS | Jason | LVEA | n | FARO info grab | 16:38 |
16:31 | PEM | Robert | EX | n | Shaker setup | 16:59 |
17:57 | SEI | Jim, Mitchell | LVEA,FCES | n | Check on racks | 17:58 |
21:21 | ISC | Camilla | OpticsLab | y(local) | Beam dump positioning for PM1 | 22:30 |
21:47 | SEI | Jim | LVEA | n | SEI rack part grab | 21:50 |
22:46 | ISC | Mayank | Opt lab | Yes | ISS PD array | ongoing |
22:58 | ISC | Keita, Rahul | Opt Lab | Yes | PM1 optic testing | ongoing |