Reports until 22:00, Thursday 13 March 2025
H1 General
oli.patane@LIGO.ORG - posted 22:00, Thursday 13 March 2025 (83368)
Ops Eve Shift End

TITLE: 03/14 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 147Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Currrently Observing at 148Mpc and have been Locked for 5 hours. The range is still low and fluctuating a bit, but it's not as bad as it was before I made the changes to the multiple phases (83367). Secondary microseeism is going back down, and the wind is low.
LOG:

23:30UTC Relocking

23:50 NOMINAL_LOW_NOISE
    - Ran SQZ ANG ADJUST to check if the SQZ servo was in a location to pull the ADF phase away
23:59 Observing

02:55 Out of Observing to check sqz angle
    - Ran SQZ ANG ADJUST and had to adjust some phases (83367)

03:13 Back into Observing

Start Time System Name Location Lazer_Haz Task Time End
21:21 ISC Camilla OpticsLab y(local) Beam dump positioning for PM1 22:30
21:47 SEI Jim LVEA n SEI rack part grab 21:50
22:46 ISC Mayank Opt lab Yes ISS PD array 00:48
22:58 ISC Keita, Rahul Opt Lab Yes PM1 optic testing 00:03
23:38 ISC Siva OpticsLab y(local) ISS PD array work 00:48
23:53 ISC Camilla OpticsLab y(local) Checking in 00:01