Reports until 07:51, Tuesday 18 March 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 07:51, Tuesday 18 March 2025 - last comment - 08:18, Tuesday 18 March 2025(83420)
Tuesday Morning Maintenance shift start.

TITLE: 03/18 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 10mph Gusts, 6mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.23 μm/s
QUICK SUMMARY:
When I walked in, H1 was in Move_Spots[508].
I don't think we were going to make it all the way to NLN before the Injections start but I will let it continue to lock until it is unlocked by activiites today or 8pm.
Well we made it all the way to Observing before 14:50 UTC.

I see I have some red on CDS overview:
H1SUSPROCPI has a pending config.

We have a 6 hour Maintenance day today!

Notes: 
PCAL team and anyone else in the End stations needs to keep cellphones away from VAC Cold Cathode; airplane
mode may be desired.
Tripping Hazard near HAM6:  a cable tripping hazard near HAM6 when Robert starts working over near the output arm.

Expected work:
LVEA:
Ham1 Laser Barrier taken down?
Lighting?
Fil HAM1 pulling cables.
Vac roughing pumps & compressor


EX:
PCAL ES Beam Mv over by 9am
Laser hazard Camilila & TJ TMS
Oplev


EY:
Oplev work Rahul
Vac EY comp

CDS:
Dan LDAS maint.
Eric BS camera server testing

Comments related to this report
david.barker@LIGO.ORG - 08:18, Tuesday 18 March 2025 (83421)

I loaded Oli's new h1susprocpi PI_PROC_COMPUTE_MODE[24,31]_BP filters at 08:11 PDT.