H1 SEI (CDS)
filiberto.clara@LIGO.ORG - posted 14:25, Tuesday 18 March 2025 (83438)
Field Cabling for HAM1 ISI

WP 12393
ECR E2200105
DCC D2200162
DCC D1002872
T2300221

Started installation of the SEI HAM1 ISI field cables. Cables are now pulled from the CER SEI-C1 rack to the LVEA near HAM2/SUS-R1. Final routing of cables will continue next week. Documents D2200162, D1002872, and T2300221 don’t have the same flange layout. Imagine they will get updated once plans are finalized. Cables will be routed to HAM1 flanges as listed below:

Corner 1: Flange D1
SEI_HAM_15
SEI_HAM_16
SEI_HAM_17
SEI_HAM_18

Corner 2: Flange D5
SEI_HAM_33
SEI_HAM_34
SEI_HAM_35
SEI_HAM_36

Corner 3: Flange D3
SEI_HAM_51
SEI_HAM_52
SEI_HAM_53
SEI_HAM_54

CPS 1&2: Flange D5
SEI_HAM_63
SEI_HAM_64

CPS 3: Flange D3
SEI_HAM_65
SEI_HAM_66

F. Clara, M. Pirello