ECR 1300578 Progress -- HLTS and HSTS Library Models Complete, Need Installation and New MEDM Screens
J. Kissel

Because the DAQ was needed this morning for measurements, we didn't resurrect the dead h1sus56 computer until the afternoon. That meant I didn't get nearly as far as I'd hoped before leaving. My apologies. The current status is reported below, and will most likely remain as such until I get back from vacation on Tuesday.
 
Status:
- Mods to the HSTS_MASTER and HLTS_MASTER library parts (and all the library parts they use) are complete -- the HSTS required a little extra thinking, unfortunately
- The MC_MASTER remains unchanged, didn't get to it
- The top-level HLTS models' (H1SUSPR3, H1SUSSR3) mods are complete, and they compile successfully
- The newly compiled front end code for H1SUSSR3 has been installed, and is now running; PR3's has not yet been installed
- Of the HSTS', only H1SUSMC1's top level model has been completed and successfully compiled. The remaining HSTS models must be reconnected as h1susmc1's has in order to compile. They are guaranteed to fail compiliation for the time being.
- None of the necessary MEDM screen modifications have been made for the HLTS or HSTS.

Because I do not commit to the repository until I have a complete package for Stuart, the outstanding svn status I reported yesterday remains.