Reports until 10:35, Monday 24 March 2025
H1 OpsInfo (ISC)
jeffrey.kissel@LIGO.ORG - posted 10:35, Monday 24 March 2025 (83523)
OMC DCPD Electronics Measurement Equipment Left Set Up but Unplugged Slightly -Y of HAM6 ISC Racks
J. Kissel

One step closer to driving an analog signal into the OMC DCPD test chain at ~10 kHz (see other prep aLOG discussion in LHO:83466 and LHO:83468), I set up the SR785, SR785 accessory box, and at the necessary cabling by ISC-R5 rack on the -Y side of the -Y side of HAM6, tucked up against the mini clean room that's there. Other commissioning activities broke the lock just as I was about to plug the setup into the wall and power on. So -- we'll try again Thursday 03/27.
All in-rack cabling is the same as is typically is for all of O4, I hadn't gotten to disconnecting the ISC_444 injection port cable yet.

Was in the LVEA for a mere 6 minutes from 2025-03-24 17:07 UTC to 17:13 UTC.

Attached is a picture of the unplugged and powered off equipment as I left it.
Images attached to this report