TITLE: 03/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 5mph Gusts, 3mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.25 μm/s
QUICK SUMMARY: H1 is currently relocking up to MOVE_SPOTS. Looks like H1 was able to lock twice last night and most recently lost lock about an hour ago. Maintenance day today, but I'll let H1 continue until those activities begin.
Halted locking for the start of maintenance day. ISC_LOCK to 'IDLE' and seismic environment to 'MAINTENANCE' at 14:40 UTC.
Power cycling the dust monitor did not help, later in the day I restarted the IOC using telnet which was successful.