This morning, I locked the BSC3 ISI and Greg went into the chamber and installed the corner cube. I'm not sure what state the ACB is normally in when the cube is attached, but it is in the lowered position right now, which made install of the cube precarious. Greg was able to do it, but it didn't look easy. Otherwise, we are ready for IAS to start working.