TITLE: 03/25 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Busy maintenance day mostly focused on preparing cabling for HAM1 ISI installation. After that wrapped up, ran an initial alignment with some code testing, then H1 was able to lock without issue and fully automatically. Had to wait in OMC_WHITENING to damp violins (likely my fault for breaking lock during powerup this morning).
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:38 | FAC | Kim | EX | N | Technical cleaning | 16:04 |
14:49 | FAC | Chris | X-arm | N | Tumbleweed clearing | 19:58 |
14:58 | CAL | Tony, Francisco | PCalLab | Local | Prep for measurements | 15:28 |
15:00 | FAC | Tyler | Staging | N | Moving ISI container; shop -> staging | 15:43 |
15:11 | CDS | Erik | CR | N | Rebooting FOMs | 15:11 |
14:38 | FAC | Nellie | EY | N | Technical cleaning | 15:17 |
15:27 | IAS | Jason, RyanC | LVEA | N | FARO surveying | 19:14 |
15:29 | CAL | Tony, Matt, Francisco | EX | YES | PCal measurements | 17:58 |
15:34 | AOS | Camilla | LVEA/OptLab | N | Putting away parts | 15:59 |
15:36 | CDS | Fil, Marc | LVEA/CER | N | HAM1 field cabling | 19:25 |
15:43 | VAC | Travis, Janos | EX | N | Compressor work | 18:25 |
15:44 | FAC | Tyler | CS/MX/MY | N | 3IFO and capital inventory | 19:44 |
15:46 | VAC | Richard | LVEA | N | Turn on roughing pump panel | 17:07 |
15:59 | VAC | Jordan, Janos | LVEA | N | Bringing parts in via FC door | 17:07 |
15:59 | FAC | Tyler, Contractor | H2 Building | N | HVAC work | 19:59 |
16:02 | FAC | Mitchell | LVEA | N | Clearing off SEI racks | 17:12 |
16:05 | FAC | Kim | LVEA | N | Technical cleaning | 18:54 |
16:08 | AOS | Betsy | LVEA | N | Checking on progress | 16:25 |
16:14 | SEI | Jim | LVEA | N | Checking on progress | 17:12 |
16:19 | TCS | Camilla | OptLab | N | Grabbing parts | 16:23 |
16:21 | ISC | Mayank, Jennie | OptLab | Local | ISS array work | 20:52 |
18:12 | SEI | Jim | LVEA | N | Testing loadcell readers | 18:27 |
19:15 | CDS | Richard | LVEA | N | Talking to Fil and Marc | 19:21 |
19:17 | AOS | Jason | OptLab | - | Inventory | 19:28 |
19:30 | OPS | Camilla | LVEA | N | Sweep | 19:45 |
20:36 | CDS | Marc | CER | N | Listening for power supplies | 21:07 |
20:54 | ISC | Keita, Mayank | OptLab | Local | ISS array work | 22:45 |
21:22 | TCS | Camilla, Matt | OptLab | Local | CO2 laser work | 22:30 |