Reports until 16:14, Wednesday 26 March 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:14, Wednesday 26 March 2025 (83567)
Ops Day Shift End

TITLE: 03/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 154Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Commissioning time for three hours this morning, which we stayed locked for. We have been locked for 11.5 hours now. I've been impatient and have tried damping down ITMY violin modes 5&6 by making small gain changes. I think I slightly sped it up, but barely.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:07 FAC Nelly MX n Tech clean 15:32
16:47 CDS Fil, Marc Mech room n Pulling cables 19:49
16:56 FAC Kim H2 building n Tech clean 17:10
16:57 ISC Mayank Opt Lab Yes ISS PD array 00:10
19:49 ISC Keita Opt Lab Yes ISS PD array 21:01
21:46 TCS Camilla, Matt Opt Lab Yes CO2 laser testing 23:46
Images attached to this report