Ops Day Shift End

TITLE: 03/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Calibration and commissioning started the day. After a lock loss at 12PT we have been struggling to relock. We just recently made it to the last state before low noise, but the violins are very high from a few lock losses at Transition_From_ETMX and Move_Spots. Oli is damping those now and hopefully we'll be back to observing soon. It's not entirely clear why we had issues relocking. The primary and secondary useism are definitely elevated, but at levels that we have locked before. Wind is under 20mph, as well.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:38 FAC Tyler EX n Adjust fan speed manually 16:08
16:29 ISC Sheila, Jeff LVEA n OMC DCPD injections, LVEA wifi on during this time 17:34
16:44 PSL Jason Opt Lab n Unpacking laser in lab and receiving 16:55
18:28 FAC Kim, Nelly MY n Tech clean 18:48
18:58 - Tony LVEA n Checking for water leaks 19:33
19:11 CDS Marc CER n Check on power supplies 19:33
19:11 CDS Fil LVEA n Check on CPS glitching 19:33
20:17 PSL Jason MX n Drop off 20:32
20:59 ISC Keita, Mayank Opt Lab Yes ISS PD array 22:18
21:23 TCS Camilla, Matt Opt Lab Yes CO2 laser testing 21:56
22:10 ISC Jennie OptLab Yes ISS help 22:18
Comments related to this report
oli.patane@LIGO.ORG - 17:42, Thursday 27 March 2025 (83601)CDS, SQZ

Back to Observing 03/28 00:34UTC after accepting a couple diffs for SQZ and IOPLSC0