TITLE: 03/27 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Calibration and commissioning started the day. After a lock loss at 12PT we have been struggling to relock. We just recently made it to the last state before low noise, but the violins are very high from a few lock losses at Transition_From_ETMX and Move_Spots. Oli is damping those now and hopefully we'll be back to observing soon. It's not entirely clear why we had issues relocking. The primary and secondary useism are definitely elevated, but at levels that we have locked before. Wind is under 20mph, as well.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:38 | FAC | Tyler | EX | n | Adjust fan speed manually | 16:08 |
16:29 | ISC | Sheila, Jeff | LVEA | n | OMC DCPD injections, LVEA wifi on during this time | 17:34 |
16:44 | PSL | Jason | Opt Lab | n | Unpacking laser in lab and receiving | 16:55 |
18:28 | FAC | Kim, Nelly | MY | n | Tech clean | 18:48 |
18:58 | - | Tony | LVEA | n | Checking for water leaks | 19:33 |
19:11 | CDS | Marc | CER | n | Check on power supplies | 19:33 |
19:11 | CDS | Fil | LVEA | n | Check on CPS glitching | 19:33 |
20:17 | PSL | Jason | MX | n | Drop off | 20:32 |
20:59 | ISC | Keita, Mayank | Opt Lab | Yes | ISS PD array | 22:18 |
21:23 | TCS | Camilla, Matt | Opt Lab | Yes | CO2 laser testing | 21:56 |
22:10 | ISC | Jennie | OptLab | Yes | ISS help | 22:18 |
Back to Observing 03/28 00:34UTC after accepting a couple diffs for SQZ and IOPLSC0