TITLE: 03/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: We lost lock from another earthquake, the wind started picking up during the afternoon but we relocked easily after an alignment. The violins have been damping nicely. The new settings I found for ETMY mode1 are FM1+FM5+FM10 G= -0.1, they damp mode1 well but don't really affect mode6.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
17:19 | FAC | Chinook | VPW | N | Heat pump work, started at ~16:30 | 18:13 |
17:54 | EE | Marc | CER | N | Trace C4 power supply wire | 18:16 |
18:01 | ISC | Mayank | Optics lab | LOCAL | ISS array | 23:15 |
18:16 | EE | Fil, Marc | CER | N | SUS-C4 power supply swap | 18:37 |
18:17 | ISC | Jennie | Optics lab | LOCAL | ISS array | 19:23 |
18:39 | FIT | Ibrahim | MidY | N | walk | 19:29 |
18:56 | TCS | Camilla | Optics lab | N | Turn on CO2 laser | 19:13 |
19:18 | ISC | Betsy | LVEA/CER | N | Grab vacstat bags | 19:39 |
20:17 | ISC | Keita | Optics lab | LOCAL | ISS array, PD adjustment | 22:15 |
20:24 | PSL | Jason | Optics lab | LOCAL | NPRO tests | 22:51 |
20:42 | TCS | Camilla, Matt | Optics lab | LOCAL | TCS CO2 laser work | 22:01 |
21:10 | PSL | RyanS | Optics lab | LOCAL | Help Jason with NPRO tests | 22:51 |