Reports until 16:30, Friday 28 March 2025
H1 General (SUS)
ryan.crouch@LIGO.ORG - posted 16:30, Friday 28 March 2025 (83615)
OPS Friday day shift summary

TITLE: 03/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: We lost lock from another earthquake, the wind started picking up during the afternoon but we relocked easily after an alignment. The violins have been damping nicely. The new settings I found for ETMY mode1 are FM1+FM5+FM10 G= -0.1, they damp mode1 well but don't really affect mode6.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
17:19 FAC Chinook VPW N Heat pump work, started at ~16:30 18:13
17:54 EE Marc CER N Trace C4 power supply wire 18:16
18:01 ISC Mayank Optics lab LOCAL ISS array 23:15
18:16 EE Fil, Marc CER N SUS-C4 power supply swap 18:37
18:17 ISC Jennie Optics lab LOCAL ISS array 19:23
18:39 FIT Ibrahim MidY N walk 19:29
18:56 TCS Camilla Optics lab N Turn on CO2 laser 19:13
19:18 ISC Betsy LVEA/CER N Grab vacstat bags 19:39
20:17 ISC Keita Optics lab LOCAL ISS array, PD adjustment 22:15
20:24 PSL Jason Optics lab LOCAL NPRO tests 22:51
20:42 TCS Camilla, Matt Optics lab LOCAL TCS CO2 laser work 22:01
21:10 PSL RyanS Optics lab LOCAL Help Jason with NPRO tests 22:51
Images attached to this report