This week Mitch and I opened the can for the ISI destined for HAM1 and started adding damping parts. Spring, flexure and GS13 can dampers have all been added. TMDs have been mostly assembled, but have not been tuned yet, we will figure that out next week. I just finished setting up the CPS field interface chassis with the new triax sensors after setting the phases for the sensors. For the moment one of the cards is set as a timing master, I will have to change that when we go to connect to the system. Next week, TMD tuning, st0 L4C install, in-vac parts for the new CPS and pre-installing lifting pads and covers for install into the chamber. Then we can close up and wait for HAM1 chamber to be ready to receive.
First 2 pics are a couple shots of the ISI, third shows the TMDs we built this afternoon, which still need magnets and tuning.