TITLE: 03/29 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 156Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: I was able to get a coherence measurement during the first lock. We've relocked 3 times this shift, no issues relocking.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
18:50 | EPO | Janos | Overpass, Yarm | N | Tour | 19:46 |
I've been damping ITMY modes 5/6 with half the nominal gain (0.005) during the second/third lock as I wasn't totally convinced the damping was going well before with the higher gain. 3/4 monitors were going down but the DARM line height on DTT wasn't really changing. TJ said he had success with this lower gain the other day as well. I put the new damping settings for ETMY mode1 into lscparams.