Reports until 07:43, Tuesday 01 April 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:43, Tuesday 01 April 2025 (83674)
OPS Day Shift Start

TITLE: 04/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 8mph Gusts, 4mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.22 μm/s
QUICK SUMMARY:

IFO is in NLN and OBSERVING, but not for long.

H1 was running PEM Mag injections when I walked in, which finished and went into OBSERVING thereafter. I will induce a lockloss and set IFO to PLANNED ENGINEERING shortly.

Today is the first day of our planned Vent Break! Here is a summary of today's planned activities, also found on Trello Coordination Page

Work safe everybody!