TITLE: 04/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in PLANNED ENGINEERING for VENT
Extremely productive first vent day in which the following planned tasks were completed:
As always, check out the trello for the most up to date vent news.
Guardian states are in the configurations attached in the screenshot
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:39 | FAC | Eric | Woodshop | N | Activate Fire Pumps | 16:21 |
15:05 | EE | Fil | LVEA | N | HAM1/2 Table Enclosure Disconnect | 23:52 |
15:10 | FAC | Kim, Nellie | FCES | N | Technical Cleaning | 15:39 |
15:12 | OPS | TJ | LVEA | N | LVEA to Laser Extra Safe (Keys, Light Pipes etc) | 15:30 |
15:34 | PCAL | Tony | PCal Lab | Local | Meas. Setup | 16:47 |
15:39 | FAC | Kim | EX | N | Technical Cleaning | 17:00 |
15:40 | FAC | Nellie | EY | N | Technical Cleaning | 16:22 |
16:09 | AOS | Betsy | OptLab | N | Power meter | 16:22 |
16:24 | FAC | Tyler, Eric | LVEA | N | Scissor lift, Crane Work | 18:27 |
16:24 | SAF | Camilla | LVEA | N | Guillotine for viewports | 19:05 |
16:26 | VAC | Janos, Gerardo, Travis, Jordan | LVEA | N | Corner Vent Prep | 19:25 |
16:26 | EE | Betsy | LVEA | N | Checking on Fil team | 17:11 |
16:36 | AOS | TJ | LVEA | N | Wrap Bag Tag Help | 19:05 |
16:46 | SEI | Jim | LVEA | N | Locking HAM HEPIs | 18:01 |
17:01 | FAC | Kim, Nellie | LVEA | N | Technical cleaning | 18:49 |
17:30 | FAC | Richard | LVEA | N | HAM1 Conduit | 17:45 |
17:43 | AOS | Ibrahim | LVEA | N | Moving ISC tables | 19:05 |
17:51 | FAC | Betsy | LVEA | N | Looking at cabling | 19:05 |
18:09 | ISC | Rahul, Mayank, Siva | OptLab | Local | ISS array work | 22:56 |
18:20 | CAL | Tony | PcalLab | Local | Measurement setup | 18:30 |
18:25 | SEI | Jim, Mitchell | FCES, Ends | N | Picking up parts and FAMIS tasks | 21:20 |
19:17 | FAC | Chris, Eric, Tyler, Randy | LVEA | N | Cleanroom move | 20:52 |
19:35 | EE | Oli | LVEA | N | Helping Fil | 22:29 |
19:43 | VAC | Gerardo | LVEA | N | Cleanroom move help | 22:06 |
19:58 | AOS | TJ, Camilla | LVEA | N | Move Scaffolding by HAM1/2 | 20:34 |
20:07 | VAC | Janos, Jordan | LVEA | N | Leak Checks | 22:06 |
20:14 | PCAL | Tony | PCAL Lab | N | PCAL Meas. | 20:20 |
20:46 | ALS | TJ | EX, EY | N | Turning on ALS | 21:27 |
20:56 | FAC | Tyler | LVEA | N | Sock Swap | 21:38 |
21:33 | TCS | Matt, Camilla | OptLab | Local | CO2 Table Work | 22:56 |
21:52 | SEI | Mitchell | LVEA | N | Seismic Assy Size Verification | 21:58 |
21:53 | AOS | Betsy | LVEA | N | Walkabout | 22:33 |
22:06 | EE | Marc | LVEA | N | Helping Fil and Oli with HAM 1/2 Table Enclosures | 00:05 |
22:07 | VAC | Janos | LVEA | N | Leak Checks | 22:41 |
22:41 | VAC | Travis, Gerardo, Jordan | LVEA | N | 23:41 | |
22:42 | FAC | Tyler | LVEA | N | Rigging Transportation | 22:53 |
23:14 | AOS | Betsy | LVEA | N | 23:25 | |
23:29 | OPS | Ryan C | LVEA | N | Dust monitor connectiom | 00:29 |