- The corner station clean air supply (Kobelco) was started up - The following GVs have been closed: GV5, GV2, RV1, FCV1, FCV2, FCV3, FCV4, FCV5 - The IPs adjacent to this part of the corner volume have been valved out: IP1, IP2, IP3, IP4, IP14 - The replacement of the HAM6 gauge was attempted, but the electronics of the brand new Inficon replacement gauge is faulty, therefore another one will be installed tomorrow - The Y-manifold turbo has been valved in with a leak checker backing, and the following flanges have been leak checked (no leaky flanges yet): - Y-manifold flanges: - X-; Y+ flanges (3 pcs.) - Vent port (1 pc.) - BSC8: - X- HEPI bellows (2 pcs.) - X- collar flanges (4 pcs.) - X+ Y+ side flanges (3 pcs.) - X+ door flanges (5 pcs.) - HAM2-HAM3 spool: - X+ Y+ side flanges (5 pcs.) - X+ bottom flange (1 pc.) - HAM3: - Y+ door flanges: (5 pcs.) - X- bottom flange (1 pc.) - Y+ bellows (2 pcs.)