TITLE: 04/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Extremely productive day in which we finished most of our activities, listed below:
Relevant alogs pertaining to today:
Attached is a picture of our SEI/SUS Guardian configurations
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:47 | FAC | Kim | Optics Lab | N | Technical Cleaning | 15:05 |
15:04 | FAC | Tyler | LVEA | N | Engine hoist | 15:23 |
15:48 | AOS | Ryan S, TJ | LVEA | N | Moving ISC Tables | 15:56 |
15:48 | EE | Fil | LVEA | N | Cable work contd. | 16:48 |
15:51 | VAC | Gerardo | LVEA | N | Purge air measurement | 19:06 |
15:54 | AOS | Betsy | LVEA | N | Walkabout | 16:33 |
15:56 | VAC | Jordan, Janos | LVEA | N | Leak checks | 19:16 |
15:59 | FAC | Nellie, Kim | LVEA | N | Technical cleaning | 19:33 |
16:07 | FAC | Chris | LVEA | N | FAMIS tasks | 17:24 |
16:13 | SEI | Jim | LVEA | N | Move L4Cs | 19:58 |
16:20 | AOS | TJ, Camilla | Optics Lab | N | Part search | 17:00 |
16:33 | FAC | Richard | LVEA | N | Looking for trip hazards | 16:54 |
17:26 | ISC | Jennie, Rahul, Mayank, Siva | Optics Lab | Local | ISS Array Work | 19:33 |
18:13 | FAC | Richard | LVEA | N | Walkabout | 18:23 |
18:38 | EE | Marc | LVEA | N | Cable work | 23:45 |
19:51 | FAC | Richard | LVEA | N | Walkabout | 19:57 |
19:56 | ISC | Siva, Mayank | Optics Lab | Local | ISS Array Work | 21:36 |
20:07 | OPS | Ryan C | LVEA | N | Dust monitor cable tracing | 21:20 |
20:10 | FAC | Tony, Corey | LVEA | N | HAM1 Bolt Removal | 21:52 |
20:40 | VAC | Jordan | LVEA | N | Leak Check | 00:38 |
20:40 | VAC | Janos | LVEA | N | Leak Check | 00:38 |
20:41 | VAC | Travis, Gerardo | LVEA | N | HAM6 Gauge Replacement | 22:28 |
20:41 | AOS | Ryan C | FCES | N | Dust monitor cable retrieval | 21:04 |
20:58 | ISC | Rahul | Optics Lab | Local | ISS Array Work | 21:36 |
21:03 | FAC | Tyler, Richard | LVEA | N | I-Beam | 22:02 |
21:30 | EE | Fil | LVEA | N | HAM1 cable work | 23:30 |
23:21 | VAC | Gerardo | LVEA | NN | Lockout GV1 | 00:21 |