Reports until 17:12, Wednesday 02 April 2025
H1 CDS (SUS)
filiberto.clara@LIGO.ORG - posted 17:12, Wednesday 02 April 2025 (83712)
HAM1 Tip Tilts - PMI/RM1/RM2

WP 12424

List of work for PMI and RMI1/2:

1. Both Sat Amplifier Chassis now installed in SUS-R1
2. Cables for RM1/2 have been terminated
3. Cables for PM1 pulled from SUS-C4 to SUS-R1
4. Cabling from Amplifier chassis for PMI/RM1/RM2 pulled to HAM1 Flange D6

Coil drivers need to be relocated in CER to lastest D0902810 drawing.

F. Clara, M. Pirello