FInished updating the sensors for HAM1 ISI in the staging building. New CPS seem to be alive and noise is within spec, considering the state the ISI is in (on storage container base and locked). TMDs and vertical L4Cs will be added in chamber. We will swap to the narrower transport base next week in prep for moving to OSB. I will post asds for cps soon, screenshot isn't working on this laptop.