H1 CDS (ISC)
filiberto.clara@LIGO.ORG - posted 15:25, Thursday 03 April 2025 (83732)
HAM1 ASC RELF WFS Cabling

WP 12438
Rack Layout D1001425

RF cables for ASC REFL WFS were pulled to HAM1 flange D6. Cables need to be dressed into the ISC-R2 rack. Some electronics in ISC-R2 were moved to make room for a delay line and 2-Ch Demodulator. Delay line chassis is installed. Demodulator chassis is being assembled at CIT. Existing coaxial cables need to be tested for delay phase before being pulled out and re-terminated. At this time some patch panel work in ISC-R2 will also be done.

F. Clara, M. Pirello, T. Sanchez, D. Sigg