TITLE: 04/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Done early for today! The corner is vented! It's possible that not everything got finished today due to a lack of water pressure causing people to leave early, but at least all of the most important tasks have been completed, if not all of them.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:37 | FAC | Randy, Mitchell | LVEA | n | Craning | 16:52 |
15:54 | FAC | Kim | LVEA | n | Tech clean | 17:42 |
16:09 | VAC | Jordan, Gerardo, Janos | LVEA | n | Corner vent | 21:41 |
16:57 | ISC | Rahul, Siva, Mayank | OpticsLab | y(local) | ISS Array (Siva out 18:31) | 20:03 |
17:29 | FAC | Mitchell | MY | n | Looking for parts | 17:57 |
17:30 | ISC | Jennie | OpticsLab | y(local) | ISS Array | 18:30 |
17:54 | PCAL | Tony | PCAL Lab | y(local) | Measurement | 18:32 |
17:58 | FAC | Mitchell | LVEA | n | Installing HAM1 ISI installation fixture | 19:02 |
19:14 | VAC | Janos | EY | n | Picking up equipment | 20:07 |
20:32 | PCAL | Tony | PCAL Lab | y(local) | Getting ready for weekend lab mode | 20:40 |
20:38 | FAC | Tyler | LVEA | n | Kickin tires with the VAC guys | 20:49 |